01
Cost Estimating
Line-item hard-bid estimates with labor, material, equipment and subcontract splits, using RSMeans Texas regional data and available project-specific quotes.
Texas construction estimating · Scope, fee and delivery confirmed in writing
Statewide estimating & quantity surveying
Detailed takeoffs and hard-bid estimates for contractors, subcontractors and developers working anywhere in the state. Priced from RSMeans Texas regional data, a stated labor basis and the soil, wind and code realities of the market your project actually sits in.
Send the project details directly to the estimating desk. We typically respond within 10–15 minutes during business hours.
Built for
Services
Depending on the scope, a deliverable can include a CSI-structured Excel estimate, marked drawings, a written basis of estimate and a concise bid summary. The proposal lists the exact output.
01
Line-item hard-bid estimates with labor, material, equipment and subcontract splits, using RSMeans Texas regional data and available project-specific quotes.
02
Measured counts, lengths, areas and volumes in PlanSwift and Bluebeam Revu, color-coded back to the drawing so every number is auditable.
03
Purchase-ready material lists with waste factors, sizes and supplier-formatted quantities for concrete, rebar, framing, roofing and finishes.
04
Bid-day support: scope gap review, sub coverage checks, alternates, unit-price schedules and a defensible number before the clock runs out.
05
AACE Class 5 through Class 3 budgets from napkin programs, site plans or schematic sets, with escalation and contingency stated openly.
06
Model-based quantities from Revit and IFC files, reconciled against the 2D set so model gaps do not quietly become missing scope.
07
Mechanical, plumbing and electrical priced in FastPIPE, FastDUCT and AccuBid, with Texas-realistic crew rates and equipment lead-time notes.
08
Carrier-ready Xactimate estimates and supplements for hail, wind and water losses — the bread and butter of a Texas storm season.
Reserved estimating capacity can be structured around monthly hours, your templates, cost codes, markups and bid calendar. Responsibilities and review gates are defined before the first assignment.
Texas estimating considerations
Regional reference data should be identified by metro, pricing date and source, then reconciled with available supplier or subcontractor quotes for the project.
Post-tension slabs, piers, moisture conditioning, select fill and over-excavation quantified from the geotech report. Foundation scope is where North Texas bids go wrong.
Fastening patterns, connectors, impact-rated glazing and enhanced sheathing priced to the wind-borne debris requirements that govern coastal counties.
Crew compositions and productivity built for a largely non-union market, with wage determinations applied only where the project actually carries them.
Every estimate states its class, basis, inclusions and exclusions so you can judge its maturity and project-specific uncertainty without treating the class as a guaranteed accuracy range.
The proposal identifies the estimator contact, included scope, deliverable format and committed delivery date before work begins.
Trade divisions
Trade packages can be measured independently or reconciled into a full-project estimate, with overlaps, exclusions and uncovered interfaces recorded in writing.
03
Post-tension slabs, piers, tilt-wall, structural decks
04
CMU, brick veneer, cast stone, reinforcing
05
Structural steel, joists, deck, misc. metals
06
Framing, sheathing, casework, rough carpentry
07
Roofing, uplift fastening, waterproofing, insulation
08
Storefront, curtain wall, impact-rated glazing, doors
09
Drywall, acoustical, flooring, paint, tile
21–23
Sprinkler, medical gas, ductwork, chillers, RTUs
26
Distribution, gear, lighting, feeders, generators
31
Cut/fill, select fill, shoring, drilled piers
32
Paving, curbs, fencing, irrigation, landscape
33
Water, sanitary, storm, lift stations, dry utilities
Software & standards we work in
Service area
Costs move across this state. A tilt-wall shell in Fort Worth, a process building in Beaumont and a hospital fit-out in El Paso carry different labor availability, haul distances and code requirements — and we price them that way.
Working outside the metros — the Permian Basin, the Valley, East Texas timber counties? Mobilization, per diem and haul distance get priced explicitly rather than buried in overhead.
Industries served
Shells, core-and-shell, tenant improvements, adaptive reuse.
Garden and wrap apartments, build-to-rent, custom homes.
Tilt-wall distribution, manufacturing, cold storage, racking.
Texas specialty
Pipe racks, process structures, midstream facilities, compressor stations, tank foundations and renewables balance-of-plant.
Medical office, surgical suites, university and K-12 work.
Water and wastewater, roadway, drainage, public facilities.
Shell and core, electrical rooms, generator yards, cooling.
Ground-up pads, restaurant builds, hotels, rollout programs.
About the firm
Texas Construction Estimating LLC provides quantity takeoffs, cost estimates and bid support for contractors, subcontractors, developers and project teams working across Texas.
The workflow starts with the documents and the purpose of the estimate. Scope, estimate class, pricing basis, exclusions, fee and delivery date are confirmed before measurement begins.
Deliverables are structured to remain usable after handoff: editable workbooks, marked drawings and written assumptions your bid team can review and update.
Working principles
Representative scopes
These are illustrative project profiles, not client claims or completed-project records. Your proposal will identify the actual documents, divisions, estimate class and deliverables for your project.
Dallas
Houston
Austin
San Antonio
Fort Worth
El Paso
How it works
01
PDF, DWG, Revit, IFC or a secure shared link. Tell us the bid date and which divisions you need so the proposal can define the fee and delivery date.
02
We confirm estimate class, pricing source, wage basis, geotech and wind assumptions, and what is excluded — in writing, before a single quantity is measured.
03
Quantities are measured in digital takeoff software, organized against the project documents and checked for pricing, scope and deliverable completeness before release.
04
You get the estimate, the marked-up set and the summary — plus a phone line for addenda, revisions and last-minute scope changes right up to submission.
Each important quantity should point back to a drawing, detail, model element or written assumption so the bid team can audit it.
Labor, material, equipment, subcontractor inputs, escalation and markups should not disappear inside an unexplained lump sum.
Inclusions, exclusions, alternates, allowances and unresolved questions should be stated before the estimate is used for a bid or budget.
FAQ
We price per project based on scope complexity and drawing set size, not a percentage of construction value. The written proposal confirms the fee and delivery date before work begins.
A quantity takeoff measures the work so your team can apply its own rates. A material takeoff organizes purchasing quantities. A cost estimate adds a stated pricing basis for labor, materials and equipment. The right choice depends on whether you need measurements, supplier quotes or a project budget.
No estimate can guarantee a final bid or construction cost. The deliverable records the documents, quantities, pricing basis, assumptions and exclusions so your team can review and approve the number it submits.
Yes. The estimating work is performed from the current digital plan set, so projects can be supported in all 254 Texas counties. The estimate still uses the actual city or county, supplier market, labor basis, freight conditions and documented site constraints. Statewide service does not mean applying one statewide location factor to every project.
Yes, when the engagement identifies the applicable plans, proposal, bid items and specifications. TxDOT work requires quantities and unit prices to follow the correct item description, measurement and payment basis. The contractor remains responsible for reviewing the complete solicitation, addenda, qualifications and final bid submission.
Send the plans and bid date for a written scope, fixed fee and delivery commitment before you approve the work.